Best Quality Gooseneck Pipe - API Tubing Pipe and Casing Pipe of Oil field – VS

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our company has been concentrating on brand strategy. Customers' pleasure is our greatest advertising. We also source OEM service for 2 Stage Air Compressor Pump, 500 650HCI 750 1205, Air Tugger, Great high quality, competitive rates, prompt delivery and dependable assistance are guaranteed Kindly allow us to know your quantity requirement under each size category so that we can easily inform you accordingly.
Best Quality Gooseneck Pipe - API Tubing Pipe and Casing Pipe of Oil field – VS Detail:

The hot-rolled precision seamless steel pipe production line adopts advanced Arccu-Roll rolled tube set to produce casing, tubing, drill pipe, pipeline and fluid piping, etc. With 150 thousand tons of annual capacity, this production line can produce seamless steel pipe having diameters of 2 3/8″ to 7″ (φ60 mm ~φ180mm) and maximum length of 13m.


Product detail pictures:

Best Quality Gooseneck Pipe - API Tubing Pipe and Casing Pipe of Oil field – VS detail pictures


Related Product Guide:

Persisting in "High high quality, Prompt Delivery, Aggressive Price", we've established long-term cooperation with clients from the two overseas and domestically and get new and old clients' superior comments for Best Quality Gooseneck Pipe - API Tubing Pipe and Casing Pipe of Oil field – VS , The product will supply to all over the world, such as: Canada, Japan, Germany, With a wide range, good quality, reasonable prices and stylish designs, our products are extensively used in this field and other industries. We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success! We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
  • This company has a lot of ready-made options to choose and also could custom new program according to our demand, which is very nice to meet our needs.
    5 Stars By Dorothy from Latvia - 2018.06.28 19:27
    Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
    5 Stars By Maria from Palestine - 2017.10.13 10:47
    Write your message here and send it to us

    Related products

    • Wholesale Discount Letourneau A Keppel Company - JH Top Dive System (TDS) Spare Parts / Accessories – VS

      Wholesale Discount Letourneau A Keppel Company ...

      JH Top Dive Spare Parts List P/N. Name B17010001 Straight through pressure injection cup DQ50B-GZ-02 Blowout preventer DQ50B-GZ-04 Locking device assembly DQ50-D-04(YB021.123) pump M0101201.9 O-ring NT754010308 Flushing pipe assembly NT754010308-VI Spline shaft T75020114 Tilt cylinder flow control valve T75020201234 Hydraulic cylinder T75020401 Locking device assembly T75020402 Anti loosening fixing sleeve T75020403 Anti loosening chuck T75020503 Backup tong locating pin T75020504 Guide bol...

    • China Gold Supplier For Maxim Drill Machine Price - DC Drive Drilling Rig/ Jackup Rig 1500-7000m – VS

      China Gold Supplier For Maxim Drill Machine Pri...

      The drawworks, rotary table and mud pump are driven by DC motors, and the rig can be used in deep well and ultra deep well operation onshore or offshore. • It can be equipped with top drive device. • It can be equipped with overall moving slide rail or stepping device to meet the requirements for movement between well locations as cluster drilling is conducted. Type and Main Parameters of DC Drive Drilling Rig: Type ZJ40/2250DZ ZJ50/3150DZ ZJ70/4500DZ ZJ90/6750DZ Nominal drilling...

    • Factory Wholesale Mms 22 S M8 Pnp Sa - JH Top Dive System (TDS) Spare Parts / Accessories – VS

      Factory Wholesale Mms 22 S M8 Pnp Sa - JH Top ...

      JH Top Dive Spare Parts List P/N. Name B17010001 Straight through pressure injection cup DQ50B-GZ-02 Blowout preventer DQ50B-GZ-04 Locking device assembly DQ50-D-04(YB021.123) pump M0101201.9 O-ring NT754010308 Flushing pipe assembly NT754010308-VI Spline shaft T75020114 Tilt cylinder flow control valve T75020201234 Hydraulic cylinder T75020401 Locking device assembly T75020402 Anti loosening fixing sleeve T75020403 Anti loosening chuck T75020503 Backup tong locating pin T75020504 Guide bol...

    • Lowest Price For Honeywell 7059 - Top Drive Service Loops (Cables) – VS

      Lowest Price For Honeywell 7059 - Top Drive Se...

      Our company can provide these products: 122517-200-25-3-B CABLE,ASSEMBLY, 42 COND. 30183959-200-25-4-B CABLE ASSY SERVICE LOOP 18 COND. 114724-BLK-50-P CABLE ASSY, POWER W/CONNECTOR BLK (646MC 114724-RED-50-P CABLE ASSY, POWER W/CONNECTOR, RED (646M 114724-WHT-50-P CABLE ASSY, POWER W/CONNECTOR WHT (646M 127421-150-B CABLE ASSEMBLY, 5 TSP (EEX) (MTO) 110078-L24 (MT)CABLE, SAFETY 110078-L18 (MT)CABLE, SAFETY 110078-L18 (MT)CABLE, SAFETY M614002913-09 GLAND,M25x1.5,EX,ARMORED-CABLE,NON-POTD (re...

    • Factory For Parker Ctc Hmi Manual - CANRIG Top Drive (TDS) Spare Parts / Accessories – VS

      Factory For Parker Ctc Hmi Manual - CANRIG Top...

      Canrig Top Drive Spare Parts list: E14231 Cable N10007 Temperature Sensor N10338 Display Module N10112 Module E19-1012-010 Relay E10880 Relay N21-3002-010 Analog input module N10150 CPU M01-1001-010 “BRG,TPRD ROL,CUPCANRIGM01-1001-010 1EA M01-1063-040, AS A SET, REPLACES BOTH THE M01-1000-010 AND M01-1001-010 (M01-1001-010 HAS BECOME OBSOLETE)” M01-1002-010 BRG, TPRD ROL, CONE, 9.0 x 19.25 x 4.88 M01-1003-010 BRG, TPRD ROL, CUP, 9.0 x 19.25 x 4.88 829-18-0 PLATE, RETAINING, BUW S0...

    • 2022 Latest Design Auger Drill Bit For Soil - AC VF Drive Drlling Rig 1500-7000m – VS

      2022 Latest Design Auger Drill Bit For Soil - ...

      • Drawworks adopt main motor or independent motor to achieve automatic drilling and make real time monitoring for tripping operation and drilling condition. • Intelligent traveling block position control has the function of preventing “bumping top and smashing bottom”. • The drilling rig is equipped with independent driller control room. The gas, electric and hydraulic control, drilling parameters and instrument displays can be arranged unitedly so that it can achieve logic control, monitorin...